Generated illustration of an imagined residential setting for the Matteson resource
AI-generated illustration; does not depict an actual property or location.

Begin with the address in Matteson

Matteson (Census place 1747540) lies in Cook County on the January 1, 2024 boundaries; confirm that the parcel is inside the municipal limits before applying local rules.

Drainage and flooding questions appear in the local research; check the parcel's own floodplain and stormwater records. The local questions below return most often to closing, legal use and permits.

Local requirements, with their limits visible

The 12 local questions below draw on official Matteson and agency material checked on October 6, 2026; the sources do not establish parcel-specific compliance. Every answer depends on the specific address, notably for closing, legal use and permits.

When preparing an offer or sale, confirm the current procedure, responsible party, required documents and timing for the exact property. Older documents, unreadable sources and conflicts require confirmation with the responsible office before relying on them.

  • Confirm sale applicability, affidavit eligibility, correction deadlines and fees with the Village.
  • The posted code may not include later legislation; confirm the current provisions with the municipality.
Reported home value
$250,600
Monthly owner costs, with mortgage
$2,213

ACS 2020–2024, municipality-wide medians in 2024 inflation-adjusted USD. Open-ended medians display a lower bound. These figures are not a current home valuation or a financing quote.

Housing types
The ACS estimates 7,631 housing units in Matteson. Largest structure categories: 1 unit, detached: 5,193 (± 442), about 68%; 1 unit, attached: 936 (± 324), about 12%; Mobile home: 326 (± 109), about 4%. Source 1
Construction periods
Of 7,631 estimated units, the largest construction periods are 2000 to 2009: 2,430 (± 424), about 32%; 1970 to 1979: 1,031 (± 298), about 14%; 2010 to 2019: 995 (± 421), about 13%; about 5% were built in 1939 or earlier. Source 1
Reported home value
The median value reported for owner-occupied units in Matteson is $250,600 (± $19,771), in 2024 inflation-adjusted dollars. Source 1 · Source 2
Monthly owner costs
Median selected monthly owner costs are $2,213 (± $156) with a mortgage and $884 (± $213) without one. Source 1 · Source 2 · Source 3
County context
The 2024 Census polygons place Matteson in Cook County; verify the parcel's county and taxing bodies in official records. Source 1 · Source 2
How to read these numbers → Compare Matteson with other municipalities →

THE HOMES BEHIND THE NUMBERS

Explore Matteson’s housing stock.

Look at the estimated mix of buildings and construction periods, then use it to shape your property research.

ACS 2020–2024 · Estimated housing units · Tap or focus a row to inspect it.

Select a row for its estimate and uncertainty. A municipality-wide distribution does not describe every individual property.

Read both housing distributions as tables
Matteson · Building types · ACS 2020–2024
CategoryEstimated unitsMargin of error, unitsShare, point estimate
1 unit, detached5,19344268.1%
1 unit, attached93632412.3%
2 units2922893.8%
3–4 units1641362.1%
5–9 units2221512.9%
10–19 units1601532.1%
20–49 units104951.4%
50+ units2341803.1%
Mobile home3261094.3%
Boat, RV, van, etc.0200.0%
Matteson · Construction periods · ACS 2020–2024
CategoryEstimated unitsMargin of error, unitsShare, point estimate
2020 or later24310.3%
2010 to 201999542113.0%
2000 to 20092,43042431.8%
1990 to 199985128711.2%
1980 to 198986931511.4%
1970 to 19791,03129813.5%
1960 to 19692801573.7%
1950 to 19595731957.5%
1940 to 19492251372.9%
1939 or earlier3531784.6%

Shares use the category estimate divided by its table total. Displayed margins of error apply to the unit counts; percentage uncertainty has not been derived. Read the original Census data · Data definitions.

YOUR QUESTIONS, ROOTED IN THE PLACE

Buying and selling in Matteson.

12 local research questions

Local research · Seller questions

What Matteson inspection route should a seller investigate?

Matteson’s Citizenserve portal lists an Existing Structure Inspection for commercial and residential sales and an As-Is Affidavit among its forms. Before scheduling a closing, ask Building Services which application and inspection obligations apply to the property and transaction. Identify any existing report and required correction or follow-up. The portal listing is a verified route into the local process, but it does not establish that every transfer qualifies for an affidavit or shares the same timetable. Obtain those details from the Village for the sale.

Address-dependent research · Checked 2026-10-06 · Source 1

Local research · Buyers & sellers

How can I check Matteson permits and zoning before buying?

Matteson’s municipal portal offers an Active Permit Search, a Public Records Request and a Zoning Verification Letter. Use the permit search to identify current projects, and ask Building Services how to obtain older records or final inspection information when the visible results are incomplete. If the proposed purchase depends on a particular use or renovation, request address-specific zoning information. These are separate research tools: an active permit list does not establish the complete improvement history, and a zoning letter does not substitute for construction approval.

Address-dependent research · Checked 2026-10-06 · Source 1

Local research · Buyer questions

Can a Matteson rental owner ignore a tenant’s water balance?

Matteson’s posted water-payment provision makes the owner, occupant and user jointly and severally liable and describes bi-monthly billing. Before buying a rental, ask the Village to reconcile the actual account and unpaid charges with the closing team. A tenant’s name on a bill does not by itself establish that the owner has no exposure under the applicable municipal provision.

Address-dependent research · Checked 2026-10-06 · Source 1

Local research · Buyers & sellers

Who maintains a Matteson sewer service to the municipal connection?

Matteson’s posted sewer provision assigns maintenance of the building service and connection to the owner through the point of connection to the municipal system. Obtain a line diagnosis and confirm its actual route before budgeting repairs. Proximity to the public sewer does not establish municipal maintenance of every pipe between the house and that system.

Address-dependent research · Checked 2026-10-06 · Source 1

Local research · Buyer questions

Does a Matteson rental license automatically follow the property sale?

Matteson’s posted rental-license section says the license is not transferable and directs each new rental owner to obtain a new one. Confirm the proposed owner, legal dwelling units and current application requirements with the Village before assuming continued rental operation. The seller’s active license or an occupied lease does not complete the buyer’s municipal licensing process.

Address-dependent research · Checked 2026-10-06 · Source 1

Local research · Buyers & sellers

Can a Matteson sale inspection replace the rental change-of-owner inspection?

Matteson’s rental section separately describes a public-safety and crime-prevention inspection on an ownership change, notwithstanding another transfer inspection. Ask the Village to identify both applicable inspection records and unresolved findings for the rental. Passing a general sale inspection does not establish that the proposed rental owner’s inspection and licensing requirements are complete.

Address-dependent research · Checked 2026-10-06 · Source 1

Local research · Buyers & sellers

What changes when I buy a vacant Matteson property?

Matteson’s posted vacant-property provision requires the new owner to register or update the existing registration after transfer and retains earlier owners’ unpaid obligations. Have the Village confirm vacancy classification, current timing and the actual registration balance before closing. A foreclosure acquisition or an existing registration does not establish that the buyer’s own registration duty is satisfied.

Address-dependent research · Checked 2026-10-06 · Source 1

Local research · Buyer questions

Can I clear healthy trees on a Matteson subdivision lot?

Matteson’s subdivision standards include Plan Commission review for removing qualifying live trees and allow replacement requirements. Establish the parcel’s subdivision status and obtain the Village’s current determination before clearing land for an addition or new build. The posted section supports a specific review question; it does not prove that every tree or proposed removal qualifies for approval.

Address-dependent research · Checked 2026-10-06 · Source 1

Local research · Buyers & sellers

Does a small Matteson site avoid all erosion-control review?

Matteson’s posted site-development exception for certain smaller residential sites is conditioned on written erosion and sedimentation measures reviewed by Community Development and the Village Engineer. Submit the actual grading scope before treating an acreage threshold as permission to proceed. An exception from that permit category does not establish exemption from building, drainage or other applicable approvals.

Address-dependent research · Checked 2026-10-06 · Source 1

Local research · Buyer questions

What helps identify maintenance obligations in a Matteson development?

Matteson’s residential-disclosure section calls for recorded development information naming parties responsible for maintenance and explaining transfers of that responsibility. Obtain the property’s actual recorded statement and association documents before budgeting detention, open-space or other common improvements. A builder’s brochure or an unfinished amenity drawing does not establish who pays once the development changes hands.

Address-dependent research · Checked 2026-10-06 · Source 1

Local research · Buyer questions

What local record can identify a new Matteson development’s taxing bodies?

Matteson’s residential-disclosure section calls for identification of taxing and jurisdictional entities, including applicable school, library and sanitary districts and Rich Township. Obtain that recorded development information, then match the parcel to current county assessment and tax records. The list can help identify authorities but does not establish the actual bill, exemptions or a student’s school assignment.

Address-dependent research · Checked 2026-10-06 · Source 1

Local research · Buyer questions

Does a Matteson subdivision drawing establish an issued home permit?

Matteson’s subdivision section distinguishes approval and recording of the final plat, applicable agency permits, approved building plans and occupancy-related purchaser acknowledgments. Ask Community Development to identify the completed stages for the actual lot before accepting a construction or move-in promise. A preliminary subdivision drawing or sale contract does not establish an issued building permit or occupancy approval.

Address-dependent research · Checked 2026-10-06 · Source 1

Sources and effective dates

Read the original guidance and use the version applicable to your property and transaction. Practical planning suggestions are distinguished from legal or program requirements.

Confirm current Falcon coverage for your exact property. This resource does not establish a service-area, school, legal-unit or parcel determination.